Products
ApplicationsStoreResources

Documentation

Find all the documentation needed for your nanopore experiments, including protocols and device manuals.

Nanopore Learning

Explore our online courses and video lessons to support your nanopore sequencing journey.

SupportAbout
Early Access Programmes
Early Access Programmes

License and Warranty - VolTRAX SLW12M-V

12-month warranty designed to ensure your instrument is performing optimally by providing the latest up-to-date hardware and software.

    285.00
    3Released
    • Products from Oxford Nanopore Technologies that have completed their Early Access
    • Users can continue to provide feedback through feature request pinboard
    • Warranty periods extended to 1 – 3 months
    • Product continues to iterate with upgrade notifications of up to 3 months
    • Lead time visible in store
    • Product subject to availability

    Flongle Flow Cell (R10.4.1) FLO-FLG114

    The Flongle Flow Cell contains the proprietary sensory array and R10.4.1 nanopores required for all V14 kits using our Kit 14 chemistry.

    Flongle adapters are available through the Flongle Starter Pack.

    This is an Early Access product

    Note: R10.4.1 flow cells are only compatible with Kit 14 chemistry

    IMPORTANT - Flongle Flow Cells ship with the Flongle Sequencing Expansion (EXP-FSE002). Always refer to the latest protocols on the Nanopore Community.

    Pack of 12 flow cells

    Product lead time: 2 weeks

      797.00
      2Early Access
      • Access the latest products from Oxford Nanopore Technologies
      • Provide feedback into the innovation team as the product develops
      • Product Warranty may initially be limited to 1 month as it is so new
      • Product routinely iterates as new features and capabilities are added
      • Estimated lead time in store
      • Product subject to availability

      On-site IQ/OQ/PQ SUPP006

      On-site installation qualification (IQ), operational qualification (OQ) and performance qualification (PQ). Available for GridION, PromethION 24 and PromethION 48.

      Installation qualification (IQ) Validation process to ensure the device has been successfully delivered and installed.

      • Correct delivery of device(s)
      • Suitable device location
      • Adequate electrical supply
      • Acceptable environmental and safety conditions
      • Appropriate connection to device peripherals

      Operational qualification (OQ) Validation process testing the operation of the system as being able to complete the hardware check.

      • Correct electrical operation
      • Functional internet connection, network settings, and system setup
      • Hardware check to validate correct operation of all flow cell positions and software

      Performance qualification (PQ) Validation process testing the performance of the system.

      • Run a Lambda control experiment to assess device performance. Recommended on initial setup and after significant changes (e.g. software update, implementing automation, new technician onboarding)
      • Check reagents, instrument, flow cell, and software performance
        5,700.00
        3Released
        • Products from Oxford Nanopore Technologies that have completed their Early Access
        • Users can continue to provide feedback through feature request pinboard
        • Warranty periods extended to 1 – 3 months
        • Product continues to iterate with upgrade notifications of up to 3 months
        • Lead time visible in store
        • Product subject to availability